by 83ladaniva on Sat May 16, 2009 9:55 pm
1, Fuse box ripped out and replaced with a new fuse system all wiring, relays, switches, lights all electrics checked, cleaned etc etc the lada now uses the plastic type fuses ALOT better prick of a job though
2, 5 speed gearbox put in found out the fiat twin cam motor was siezed in piston #4 so today i ripped the head off to find stacks of rust in the #4 chamber wass'nt pretty but believe it or not my father and I got this thing cleaned up and all pistons move freely again :O do have pics will post them up as soon as i can but i didnt get any pics of what the chamber looked like before the clean up so im spewing but managed to get a pic of the head which will show how badly #4 was head was also siezed but got that free'd up aswell
3, Brakes OMG what a nightmare have virtually replaced the complete brake system then the other night when we took it for a test run we blew one of the front caliper piston rubber seals so they got replaced
4, New underfelt been put in throughout
5, new rear panel been welded on to replace the real rusted one that was on there
These are the problems that still need to be sorted out
1.8ltr fiat engine rebuilt obviously
Carpet